Waters Construction Co. has been doing Sitework since 1981. And in the 30+ years since then, Waters has expanded greatly, both in its amount and type of work, as well as its efficiency and ability. This division today has the capacity to manage and construct projects in the $500,000 to $ 25,000,000 range for both the private sector as well as state and municipalities. Due to its management depth and experience as a general contractor in the road construction division, Waters Construction is extremely well versed at scheduling, project engineering and value engineering. This experience will translate into lower management costs for the owner/construction manager and a higher probability of a timely completion of a project.

Completed Projects

West Haven Beach Sand Replenishment 2016

Waters Construction will be replenishing sand at West haven beaches again this year.

Seymour, CT
2012-2013

Kerite project in Seymour, Connecticuit is the result of storm damage from 2011. Because of this, there was a need to unpin the building that runs over a small river. This project increased the flow of the river that runs under the Kerite facility. There were also two retaining walls builts and fixed that assist in the structural value of the building.

Site work for the new construction of CREC Medical Professions and Teacher Preparation Academy
New Britain, CT

The CREC team in Hartford is buliding a new school in New Britain starting in September of 2012 and Waters Construction is providing the site work. This will include excavation, grading, utilities and preparations for the new buildings.

Waters will be excavating for the foundations of the new facility, 140,000 sf. We will also be providing the storm drainage, utilities and side walks as well as the grading for the parking lot.

CREC facilities are located within the greater Hartford area. www.crec.org

PB120120

Harborview Towers Bridgeport, CT- Bridgeport Housing Authority

Cooperative Arts & Humanities High School

Location: New Haven, Connecticut
Owner: City of New Haven
Role: Subcontractor
Value: $ 548,000

Parking Lot rehabilitation, Drainage and Electrical @ Cooperative Educational Services School

25 Oakview Drive
Trumbull, CT

Waters Construction restored the parking facilities at the CES School in Trumbull, CT. A vital part of each day is transporting children safely to and from the facilities and into and out of buildings. Waters was called on to put a safe, efficient and proper plan into action. By providing for easier and safer driving and foot traffic with added and updated lighting to the parking facility, we have enhanced the every day activities at this CES school. This project was particularly rewarding, knowing that we are able to help our youth recieve their education in a timely and safe manner.

CT DOT 35-187 Darien Speed Change Lanes and Noise wall

CT DOT 92-620 Construction of a Waste Stockpile Area

Construction of Salt Shed

Apr 03 - May 04

Intermodal Transportation Center

2005

Southfield Village Phase 3

2005

Parapet Wall & Railing for Main St

2005

John C. Daniels School

2004

Boheringer Ingelhiem

Oct 04 - Oct -05

Prince Welch School

Jul 04 - Oct 04

McKinley Elementary School

Aug 02 - Nov 03

Dover Compressor Station

Jul 02 - Jun 03

Southfield Village Phase 2

Jun 02 - Oct 03

Nathan Hale School

Mar 02 - Nov 04

SCSU Engleman Hall

Jul 01 - Nov 05

Arena at Harbor Yard

2000

Installation of Box Culvert for US 7

Jul 99 - Sep 99

Queen of the Clergy Residence

Nov 98 - Nov 99

Wal-Mart

Apr 96 - Dec 96

Meadow Ridge

Nov 00 - Apr 03

Thomas Edison Middle School

Sep 00 - Nov 01

Culvert Replacement Rt 142

May 00 - Aug 02