Danbury Airport

2019

Runway 8-26: Mill, Overlay and Groove, Crack Seal and Seal Coat

UPS Hartford

2017

New parking lot for distribution center, including drainage, lighting and concrete pads.

state office

State Office Garage

2017

Parking Garage Site Concrete, Paving and Curbs 

Rentschler Field-Phase 2 Roadway Improvements East Hartford Blvd North Extension

2017

Town road into proposed shopping plaza, curb sidewalk and paving. 

Waterbury City Green Improvements

2016

This project consists of demolition of concrete walks, installation of lighting and electrical supply, site furnishings, landscaping, concrete flatwork, pavers and miscellaneous site improvements.

Penfield Pavilion- Penfield Beach

2016

West Haven Savin Rock Beach Sand Replenishment

2016

Replenishment of 21,000 tons of Beach Sand due to washout from Super storms. 

Sikorsky Airport

2015

Reconstruct, Mark, and Light Runway 6-24 [100’ x 4677’], Construct, Mark, and Light Transitions on Stub Taxiways A, B, C, and H and Install Modifications in. Electric Vault at Igor I. Sikorsky Memorial Airport, 1000 Great Meadow Rd, Stratford

 

Emmett O’Brien Technical High School

2014

Site work for the additions and renovations to Emmett O’Brien Technical High School including concrete flatwork, retaining walls, drainage, sewer and water

Central High School

2014

Site work package inclusive of Underground utilities, foundations, slabs, site concrete, paving, landscaping, concrete footings and walls

Tweed New Haven Airport

2013

Rehabilitation of Landside Driveway and Parking Lot

Prospect Beach West Haven

2012

Replenishment and grading of 40,000 tons of sand 

Kerite Facilities Repair Project

2012

CREC Medical New Britain

2012

The CREC team in Hartford built a new school in New Britain This includes excavation, grading, utilities and preparations for the new buildings.

Waters excavated for the foundations of the new facility, 140,000 sf, as well as the storm drainage, utilities and sidewalks as well as the grading for the parking lot.

CREC facilities are located within the greater Hartford area.

Know More

Harborview Towers Bridgeport, CT- Bridgeport Housing Authority

2011

Pulse Point

Pulse Point Safety and Security Improvements

2009

Cooperative Arts & Humanities High School

2008

McKinley Elementary School

2003

Thomas Edison School

2001

Danielson Airport

2021

The Connecticut Airport Authority, Danielson Airport, project consisted of two phases. Phase 1 was to rehabilitate runway 13-31 as well as taxiway B. Phase 2 consisted of rehabilitating the aircraft apron as well as airfield lighting and signs. During the duration of the project, approximately 6,300 linear feet of runway and taxiway will be paved as well as the apron with approximately 7200 tons of asphalt.