Windsor Locks/East Windsor Project No. 164-234

The project consists of the micro-milling of bridge decks, repairs to rutted sections of pavement, and the replacement of catch basin structures, median barriers and bridge joints. The entire section of I-91 will then be overlaid with a thin surface treatment known as Ultra-thin bonded HMA which is one of several pavement preservation strategies used by the Department to extend the service life of the existing highway system.

This Project and our work on it was featured in This Article in the Construction Equipment Guide